The lay, which is the stack of fabric layers ready to be cut, is where most hidden cutting problems begin. A good marker cut from a badly spread lay still produces bad panels. Spreading and lay planning deserve the same attention as the marker itself.
Lay planning: decide before you spread
Lay planning turns the order quantity and the available fabric into a set of lays. For each lay the planner decides:
- Which sizes and how many pieces go in each marker.
- How many plies the lay will carry.
- Which rolls, and which dye lot, go in the lay.
- The lay length, which is set by the marker length plus end allowances.
Two things limit ply height: the cutting method (a straight knife can only cut so deep, and a deep lay moves under the blade) and the fabric (slippery or bulky fabrics need fewer plies). Choose a height that your cutting equipment can cut accurately, not the highest it can physically manage.
Before spreading
- Confirm the roll is inspected and the dye batch is approved.
- Check roll width against the marker width. A marker made for a wider roll will not fit.
- Clean the table. A single stray thread or pin shows as a bump through every layer above it.
- Place the marker or table marking so the lay starts at the right point, with a small allowance at each end.
During spreading
- Alignment. One edge of every ply should sit against a guide or be aligned to a fixed reference, so the selvedge is straight through the stack.
- Tension. Fabric should fall flat and relaxed. Pulling it tight to remove wrinkles builds in future shrinkage.
- Direction and face. Follow the rule set for the style: all face up, face to face, one way or two way. Napped, brushed and directional-print fabrics must run one way.
- Defect handling. Cut out or mark flagged defects, and overlap the fabric at the splice so the defect does not fall inside a panel.
- Splices. Overlap the end of one roll onto the start of the next by the amount your marker plan allows, and make sure no pattern piece sits across the splice.
After spreading
Check the ply count against the plan, then check lay height at the edges and middle. A lay that is higher in the middle will cut differently from top to bottom. Tag the lay with order, marker, size ratio, roll numbers and the spreader's name so any later problem can be traced back.
Spreading method also matters. Manual spreading needs two people, one on each side of the table, moving together so the fabric is not dragged. Machine spreading is faster and gives more even tension, but the machine must be set up for the fabric weight and checked at the start of every lay. Whichever method is used, mark the end of each ply cleanly and cut the fabric with a straight, square cut, because ragged ends produce uneven lay ends and waste fabric at the end of every ply.
Mistakes to avoid
- Mixing dye lots inside one lay when shade has not been approved for mixing.
- Spreading before the marker is final.
- Leaving a loose end of fabric that shifts as the cutter moves.
- Cutting the full lay when a few plies at the end are short, which leaves odd quantities in some sizes.
Why it pays off
Better spreading means fewer shade and size problems later, and more reliable cut quantity against order quantity. If you want to review how this fits the rest of your flow, see cut-to-pack consultancy or the seven-stage overview.