Muhammad Ijaz Anwar is a manufacturing leader in the textile and apparel industry, based in Gujranwala, Pakistan. He currently works as General Manager, Cut to Pack, and has spent more than 23 years across production, quality systems and customer delivery. This page gives a plain, factual profile for anyone searching for Ijaz Anwar, Muhammad Ijaz or Muhammad Ijaz Anwar and wanting to know who he is and what he does.
The short version
- Current role: General Manager, Cut to Pack at W. Brothers Apparel, since November 2022.
- Experience: 23+ years in textile and apparel, across five manufacturers.
- Focus: end-to-end cut-to-pack execution, which means everything between fabric readiness and final dispatch.
- Quality background: Lean, JIDOKA, KANBAN, GEMBA and Total Line Stabilization (TLS).
- Location: Gujranwala, Pakistan.
- Languages: English and Urdu.
What he does
In his own words, taken from his CV, Muhammad Ijaz Anwar is a results-driven manufacturing leader whose main focus is cut-to-pack execution. In practice that means converting order requirements into practical floor plans, securing fabric and trim readiness, driving sampling and pre-production approvals, and then controlling cutting, sewing-line flow, finishing, packing and dispatch.
He leads cross-functional teams across production, merchandising, planning, stores, procurement, technical and quality teams, and logistics. The goal of that coordination is to protect output, workmanship, cost and on-time delivery. If you want the term explained in full, read cut to pack explained.
How his career is shaped
His career started on the quality floor and moved up into general management. He began as a QMS Supervisor in 2003, became a Deputy Manager at Sapphire Fibers, later served as Senior Manager, QMS at Masood Textile Mills, then Production Cut-to-Pack Manager at Zephyr Textile, and now General Manager, Cut to Pack. The step-by-step version is in the career journey article.
That path matters because it is unusual in one useful way: he has seen quality problems, fabric approval problems and shipment problems from the inside, and he now carries responsibility for all of them in one job.
Who he has worked for
His CV lists customers including JD, Ellesse, Blank Essentials and Jack in his current role, plus brands such as Lacoste, Foot Locker, JCPenney, PVH and Fruit of the Loom in earlier roles. The complete list, grouped by employer, is in the brands article.
Why people look him up
Most visitors arrive for one of three reasons: they are considering him for a senior manufacturing or operations role, they run a factory and want help with shipment delays, rework or buyer audits, or they work in the industry and want to learn from his published notes on production management.
For factory owners, he offers consultancy for textile and apparel manufacturers, covering cut-to-pack flow audits, Lean floor systems, quality and buyer compliance, sampling approvals, fabric and dye-batch control, and cost and wastage control. For employers and recruiters, the full background is on the about page and in his downloadable CV.
How to reach him
His contact details are on the site: he can be reached by email, phone or WhatsApp, and he is on LinkedIn. Practical advice on getting in touch is in the contact article.
A note on accuracy
Everything on this site about his career is taken from his CV. Nothing is estimated or rounded up, and brand names belong to their respective owners. Where the CV does not say something, this site does not claim it.